Skip to main content

FGCC is a national distributor for most major (UPS) Uninterruptible Power System OEM brands.

Call your FGCC team member for a quote on any:

  • UPS System
  • UPS Battery System
  • UPS Maintenance Bypass
  • UPS PDU requirement
  • Lithium Ion Battery Options

Our team provides turn-key installation services for all sized projects.

This includes the equipment selection, sizing, site assess, rigging, electrical installation, any mechanical requirements, all through startup and commissioning.

Call us to help with your UPS selection process.


Important details we can assist with are:

  • UPS Sizing
  • Voltage input / output
  • Breaker Sizing- Power Distribution Availability
  • Wire Sizing
  • Heat Load
  • Seismic
  • Startup, Integration, and Commissioning

UPS Product Cost Estimates

Three Phase 10-100kVA UPS and Associated Equipment ($15k-$50k)

  • Power Distribution System (Output to Racks)
  • Maintenance Bypass
  • Input Power
  • Software Monitoring
  • Battery Runtime (Lithium Ion Options)

120kVA – 500kVA UPS and Associated Equipment ($40k-$225k)

  • Power Distribution System, PDU, RPP, transformer
  • Maintenance Bypass
  • Input Power
  • Software Monitoring
  • Battery Runtime (Lithium Ion Options)

750kVA – 2,000kVA UPS and Associated Equipment ($200k-$400k)

  • Power Distribution System, Switchgear, PDU, RPP, transformer
  • Maintenance Bypass
  • Input Power
  • Software Monitoring
  • Battery Runtime (Lithium Ion Options)
  • Redundancy Options

Should I order a UPS System from the Internet?

No you shouldn’t.

UPS systems are one of the most critical components to your load system.

You should have an electrical partner on board, or assisted by a team like FGCC. You will incur restocking fee’s and extensive freight costs for making a small mistake of ordering a UPS system from the internet or a equipment warehouse company.


Mistakes from ordering UPS Systems online

  • Wrong Voltage Configuration
  • Wrong battery runtime
  • Wrong Receptacle configuration on unit
  • Inability to install due to wiring/physical issues
  • Incompatible with system (ie. Generator, up/downstream distribution)
  • Wrong system capacity

Please contact one of our FGC Construction Team of professionals today to assist in your upcoming UPS System project.

Related Projects

Our Experienced Project Managers are focused on the quality and completion of your project.

Completed

Harrahs Gulf Coast Hotel & Casino

View Case Study

Completed

Data Center | Silicon Valley

View Case Study
  • FGC Construction installed an entire megawatt of UPS and generator upgrade to our 3d Printing facility. This holds our power stable and provides unlimited runtime. Much appreciated!

    Lee M.COO - Boston, MA
  • FGC Construction delivered 2.5MW of high density data center in the middle of Silicon Valley. City planning to utility negotiations. Very impressed!

    Tim S.CFO - Silicon Valley, CA

Bitcoin Mining vs. Data Center Design Techniques

Read More

How to Execute a Successful Data Center Relocation

Read More

Effective Data Center Maintenance Strategies for Ideal Performance

Read More

Start a Project

We want to work with you.

Contact Us

Our experts are ready to talk.

(855) 240-6776 Click Here for a Quote.