FGC Construction works with all major manufacturers of Data Center Automatic Transfer Switch systems (ATS) and generator systems.

automatic transfer switch sizing

We can assist with custom configurations that integrate with different generator systems, challenging data center generator and electrical distribution situations, and generator/automatic transfer switch sizing or replacement equipment solutions. Many facilities have antiquated ats and generator systems which makes it a challenge for new IT installations. The FGCC team will provide you with a roadmap and a solution for most any data center environment.

Our estimators are experienced Data Center Electrical Professionals. They can produce data center electrical one line diagrams to help with the development of your project. They provide professional sizing assistance and suggestions for technology.

automatic transfer switch sizing

The ATS is an important point in any electrical distribution system. It can be a single point of failure if it does not operate or integrate correctly with the generator and utility system.

The electrical switchgear distribution point is where you will maximize your electrical capacity for your data center or critical load. Because kW power is money, you will want to make sure you are getting every kw delivered into your facility possible.

This distribution point is also a very important decision point on how you are going to distribute power to loads. The switchgear and breaker panels are to be set up to transfer power on to your data center floor pdu’s, electrical panels within the data center, or to other distribution points within your facility.

If the project is data center equipment swap out, FGCC can oversee the installation of new generator, UPS, HVAC, PDU, and all other electrical and mechanical systems. The coordination of new equipment cutover, plan for removal and installation with lowest impact on loads and the facility is something FGC Construction team specializes in.


FGC Construction is an experienced team that is used to working in live mission critical facilities and understand the proper procedures for working in specific areas of a facility.

Please contact one of our FGC Construction Team of professionals today to assist in your upcoming Data Center Automatic Transfer Switch Installation project.

Related Projects

Our Experienced Project Managers are focused on the quality and completion of your project.

Completed

Harrahs Gulf Coast Hotel & Casino

View Case Study

Completed

Data Center | Silicon Valley

View Case Study
  • FGC Construction installed an entire megawatt of UPS and generator upgrade to our 3d Printing facility. This holds our power stable and provides unlimited runtime. Much appreciated!

    Lee M.COO - Boston, MA
  • FGC Construction delivered 2.5MW of high density data center in the middle of Silicon Valley. City planning to utility negotiations. Very impressed!

    Tim S.CFO - Silicon Valley, CA

Bitcoin Mining vs. Data Center Design Techniques

Read More

How to Execute a Successful Data Center Relocation

Read More

Effective Data Center Maintenance Strategies for Ideal Performance