Skip to main content

FGC Construction has extensive experience with the critical electrical systems supporting data centers.

With over 25 years and $225m in critical data center upgrades, our core competency is the management and installation of critical power equipment such as UPS Systems and Generators. We work in all states in the contiguous US. We have relationships with all major manufacturers of UPS and Generator Equipment.

Our team provides turn-key installation services for all sized projects. This includes the equipment selection, sizing, site assess, rigging, electrical installation, any mechanical requirements, all through startup and commissioning.

One group start to finish.

Important services we provide are:

  • Generator Sizing and load assessment
  • Power Distribution System assessment to accommodate new equipment
  • Enclosure Options, sound attenuation
  • Location, local ordinances, dBA requirements, permitting
  • Wire Sizing, one lines, proper assessment of electrical installation costs
  • Airflow, proximity, and clearance
  • Physical Delivery, Offload, Rigging, Setting, pads, location
  • Physical connections, Electrical, SNMP, Power conduits
  • Startup, Integration, and Commissioning

Generator Installation Cost Estimates

50kW -100kW Generator Equipment Cost and Installation ($35k-$70k)

  • Power Distribution System (Output to Racks)
  • Maintenance Bypass
  • Input Power
  • Software Monitoring
  • Battery Runtime

120kW – 500kW Equipment Cost and Installation ($80k-$200k)

  • Power Distribution System, PDU, RPP, transformer
  • Maintenance Bypass
  • Input Power
  • Software Monitoring
  • Battery Runtime

750kW – 2,000kW UPS Equipment Cost and Installation ($250k-$600k)

  • Power Distribution System, Switchgear, PDU, RPP, transformer
  • Maintenance Bypass
  • Input Power
  • Software Monitoring
  • Battery Runtime
  • Redundancy Options

If the project is data center equipment swap out, FGCC can oversee the installation of a new generator, UPS, HVAC, PDU, and all other electrical and mechanical systems. The coordination of new equipment cutover, plan for removal and installation with the lowest impact on loads and the facility is something the FGC Construction team specializes in.

FGC Construction is an experienced team that is used to working in live mission critical facilities and understand the proper procedures for working in specific areas of a facility.

Please contact one of our FGC Construction Team of professionals today to assist in your upcoming Generator Installation project.

Related Projects

Our Experienced Project Managers are focused on the quality and completion of your project.

Completed

Harrahs Gulf Coast Hotel & Casino

View Case Study

Completed

Data Center | Silicon Valley

View Case Study
  • FGC Construction installed an entire megawatt of UPS and generator upgrade to our 3d Printing facility. This holds our power stable and provides unlimited runtime. Much appreciated!

    Lee M.COO - Boston, MA
  • FGC Construction delivered 2.5MW of high density data center in the middle of Silicon Valley. City planning to utility negotiations. Very impressed!

    Tim S.CFO - Silicon Valley, CA

Bitcoin Mining vs. Data Center Design Techniques

Read More

How to Execute a Successful Data Center Relocation

Read More

Effective Data Center Maintenance Strategies for Ideal Performance

Read More

Start a Project

We want to work with you.

Contact Us

Our experts are ready to talk.

(855) 240-6776 Click Here for a Quote.