XO (Portland, OR)- Our customer was looking to add additional UPS power for a new tenant that was moving into their data center. Since their current infrastructure was already allocated, they needed to install a new 300kVA UPS, PDU (Power Distribution Unit), and circuits to the new customer cabinets. After the installation was completed, we moved into commissioning. We provided XO with our FPT (Functional Performance Testing) script so they could review and make any recommendations to it. After putting the new equipment under various tests and recording the data from these tests, commissioning was now complete. FGCC provided a final Commissioning Report that included all of the testing that was performed and verified.
FGC Construction installed an entire megawatt of UPS and generator upgrade to our 3d Printing facility. This holds our power stable and provides unlimited runtime. Much appreciated!
Lee M.COO - Boston, MAFGC Construction delivered 2.5MW of high density data center in the middle of Silicon Valley. City planning to utility negotiations. Very impressed!
Tim S.CFO - Silicon Valley, CA