Skip to main content
View all Projects

CRU

1 Minute read

CRU (Orlando, FL)- CRU was looking to add a second power source to their data center to create a “B” power source. In adding this infrastructure, we constructed a dedicated room to house the new UPS, input/output distribution, chilled water cooling, and fire pre-action system. During the installation of the added UPS, we needed to add this system into their EPO scheme. The current EPO system would not allow for additional outputs so it was time for an upgraded system that could accept all of the various equipment that needed to be shut down in the event of an emergency situation. FGCC had designed a custom panel to accept the necessary inputs and outputs. The old system was demoed out and the new system installed, and commissioned.

  • FGC Construction installed an entire megawatt of UPS and generator upgrade to our 3d Printing facility. This holds our power stable and provides unlimited runtime. Much appreciated!

    Lee M.COO - Boston, MA
  • FGC Construction delivered 2.5MW of high density data center in the middle of Silicon Valley. City planning to utility negotiations. Very impressed!

    Tim S.CFO - Silicon Valley, CA

Start a Project

We want to work with you.

Contact Us

Our experts are ready to talk.

(855) 240-6776 Click Here for a Quote.